Technical Bulletin: Judging Interior Treated Gypsum Board

Technical Bulletin: Judging Interior Treated Gypsum Board

Specifying the proper level of finish on a gypsum board project starts with the architect preparing contract documents that accurately reflect the desires of the owner to the bidding wall and ceiling contractor.

Read More

Technical Bulletin: Environmental Conditions

Maintaining the interior temperature and humidity levels (environmental conditions) in compliance with the manufacturers’ recommendations and ASTM requirements are critical to achieving an acceptable appearance and performance of Gypsum Board.

Read More